Facebook
Apr.2024 25
Views: 28
Use of rock drilling rigs
Introduction
Use of rock drilling rigs
Details
Use of rock drilling rigs
(1) Before work, check whether the pump, air compressor, etc. are normal; and check whether there are oil, water, and air leaks in the pipelines, joints, etc.
(2) Before starting work, ensure that all joysticks, control devices and instruments are in normal condition.

Walking work

(1) Lower the lifting platform, retract the sliding workbench, retract the boom, level the guide rod, keep the rock drill in the starting position, and retract the legs before walking.
(2) Before moving the trolley, you should check around the site to make sure there are no people in front, on the left, left, and right, and that there are no obstacles, and then operate according to the instructions of the guide. Never touch the operating lever by mistake.
(3) Walk steadily to avoid accidents during emergency operations, especially when going up or downhill. The body of the trolley is very long. Even if the steering angle is not large, the front and rear ends of the body will swing extremely, so be particularly careful when operating.
(4) When walking in narrow tunnels, pay special attention to your surroundings. When rolling up the cable, the operator must follow the instructions of the guide.
(5) The hydraulic oil temperature should be maintained in the range of 30 to 70°C. If it exceeds 70°C, the movement should be stopped immediately.

Leave a message
FirstName*
LastName*
Email*
Message*
Mobile*